Clippership Wharf by Halvorson | Tighe & Bond
Halvorson | Tighe & Bond: Clippership Wharf occupies two former industrial wharves on East Boston’s waterfront. Vacant and closed to the public for three decades, the site has...
Halvorson | Tighe & Bond: Clippership Wharf occupies two former industrial wharves on East Boston’s waterfront. Vacant and closed to the public for three decades, the site has...
The crack required closing one bridge lane and calling the town structural engineering consultant to design a repair.
The 118,000-sq-ft facility consolidates critical biotechnology manufacturing operations into a single site
With procurement underway on the Massachusetts Department of Transportation’s $2.5-billion Sagamore Bridge design-build replacement project, contractors are already conducting a dr...
MTA has selected STV and WSP in a joint venture to lead design and preliminary engineering for a major climate resilience program along Metro-North’s Hudson Line. The project is pa...
To improve upstream fish migration and restore aquatic connectivity along the river corridor, the project team designed a technically complex fish ladder.
Information is derived from Industrial Reports, a market intelligence firm specializing in industrial construction and equipment leads. To receive the full report with details and...
But before work even approached the active lines, crews first built 100,000 sq ft of greenfield space, transitioned people and equipment inside, then proceeded with the legacy buil...
Information is derived from Industrial Reports, a market intelligence firm specializing in industrial construction and equipment leads. To receive the full report with details and...
The project team first strengthened the underlying truss by installing additional steel plates and angles and replacing 70-year-old rivets with high-strength bolts.
Jason Kjenstad and Jay Chiglo have been elevated to U.S. North Central Transportation Director and U.S. South Central Transportation Director, respectively, at HDR, an Omaha, Neb.-...
While relighting tunnels at the I-405/I-105 interchange, exposure to traffic proved to be the most dangerous variable.
The project advanced the 978,277-sq-ft, 17-story office building’s transition to electric-powered heating and cooling through water-source heat pumps and an ambient loop.
The new pier will feature a higher deck elevation to accommodate projected sea level rise.
GHD has been selected as the design engineer for the new marine terminal at the SeaPoint Industrial Terminal Complex in Savannah, Georgia, partnering...
After more than 40 years of planning, a 2.5-mile east-west corridor now connects SR 32 to SR 37.
After work stopped on an $86-million project, engineers identified vulnerabilities in partially demolished spillway walls and developed corrective measures whose completion remains...
In designing and building a critical section of underwater pipeline, the project team on the James River Crossing pushed the perceived limits of horizontal directional drilling wit...
Safety at Polaris Forge 1 was built into all stages of project planning, engineering and construction.
Act 250 112626 2×5 Masterson ExcavationDownload
Use SocialBu to discover ideas, generate post drafts, and schedule them across your social channels.